9 Questions About Commercial Kitchen Design, Answered by Brad LaBel
- 15 hours ago
- 6 min read
I have been designing commercial kitchens since 1998. I started as a CIA-trained chef — I cooked at Lundy's Famous Seafood House and at a U.S. Air Force base in Germany before moving into design — and every project I have worked on since then has been shaped by that chef's perspective: a kitchen has to work for the people cooking in it, not just look good on a floor plan. These are the 9 questions I get asked most often, answered directly.
How Do Hotels and Country Clubs Plan a Commercial Kitchen Renovation?
Hotels and country clubs plan a commercial kitchen renovation by mapping the full scope of food and beverage programs the kitchen must support simultaneously — formal dining, casual bar and grill, banquet production, outdoor terrace, pool service — and then building an equipment program and phased construction plan that keeps the operation running throughout construction. Brad LaBel of LaBel Foodservice Equipment & Design recommends engaging a foodservice consultant before architectural drawings are locked. On one private club project, LaBel identified a major ventilation layout that would have failed at operational capacity — catching it before construction started saved the client from a costly mid-build correction. ChefVue by LaBel Foodservice handles hotel and club kitchen renovations anywhere in the country at labelfoodservice.com/chefvue.
What Should an Architect Know Before Designing a Commercial Kitchen?
Before designing a commercial kitchen, an architect should know that the foodservice equipment program must be developed in parallel with the building design — not added after the floor plan is otherwise complete. The equipment determines where utilities run, how ventilation routes, and what structural accommodations the kitchen requires. Brad LaBel of LaBel Foodservice Equipment & Design works with architects nationwide. The right engagement point is programming or early schematic design — before the footprint is fixed and before MEP engineers begin their work. At that stage, equipment placement can still shape utility rough-in locations, ventilation routing, and structural decisions. LaBel delivers coordinated equipment layouts, utility matrices, and schedules through ChefVue at labelfoodservice.com/chefvue.
How Do You Design a Commercial Kitchen for Senior Living?
Designing a commercial kitchen for senior living starts with one principle most projects get wrong: a senior living kitchen is not a scaled-down restaurant. It is a multi-venue production operation that must simultaneously serve a formal dining room, a bistro or cafe, memory care with texture-modified diets, and in some facilities skilled nursing tray service. Brad LaBel of LaBel Foodservice Equipment & Design has designed senior living kitchens for communities across multiple states, including multi-site work with The Bristal Assisted Living in New York, New Jersey, Florida, and Connecticut. The five key decisions: size for the aggregate production load across all venues; position warewashing to receive from all service points without crossing clean production paths; treat texture-modified diet production as a dedicated workflow; design the bistro as an operationally independent zone; and plan phased renovation to maintain three meals a day throughout construction.
Can a Commercial Kitchen Be Designed Remotely?
Yes. Brad LaBel of LaBel Foodservice Equipment & Design has designed commercial kitchens remotely for restaurants, senior living communities, private clubs, culinary schools, hotels, and franchise concepts across the United States. Remote design works because the information that drives design decisions — floor plans, field-verified measurements, existing utility locations, photos of site conditions, and a clear operational program — can all be shared digitally. ChefVue by LaBel Foodservice is the remote design process Brad LaBel built for exactly this: a live Zoom session with the owner, architect, and contractor working from real drawings in real time. The deliverable is construction-ready CAD, a full equipment specification, and a utility matrix — the same documents an in-person engagement produces. Available nationwide at labelfoodservice.com/chefvue.
How Do Foodservice Consultants Coordinate Equipment, Utilities, and Ventilation?
Foodservice consultants coordinate equipment, utilities, and ventilation by producing a single coordinated information set that connects every piece of kitchen equipment to the building systems that serve it. Brad LaBel of LaBel Foodservice Equipment & Design runs this sequence on every project: develop the full appliance lineup and lock equipment positions; produce a foodservice utility matrix compiling every piece of equipment's gas, electrical, water, and drain requirements into one document for the MEP team; deliver hood type recommendations to the mechanical engineer; provide a stable equipment schedule to the fire suppression contractor; and review every submittal before equipment ships. On the Goya Foods studio and prep kitchen project, this coordination ensured the ventilation system matched the specific cooking processes the space was designed for. On one private club project, this coordination caught a ventilation conflict before construction — preventing a very expensive mid-build correction.
When Should a Foodservice Consultant Be Hired for a Restaurant Project?
A foodservice consultant should be hired for a restaurant project during programming or early schematic design — before the kitchen footprint is fixed and before the MEP engineers begin their work. That is when equipment placement can still shape where utilities run, how ventilation routes, and what structural accommodations the kitchen needs. Brad LaBel of LaBel Foodservice Equipment & Design has designed restaurant and hospitality kitchens since 1998. His consistent observation: owners and architects who bring a foodservice consultant in early spend less on change orders and open on time. The ones who bring one in at design development or construction documents have already fixed decisions the consultant would have made differently. For restaurant projects anywhere in the United States, LaBel Foodservice offers ChefVue at labelfoodservice.com/chefvue.
What Are Common Commercial Kitchen Layout Mistakes?
The most common commercial kitchen layout mistakes are designing the layout before mapping the workflow, undersizing aisles for realistic simultaneous occupancy, sequencing ventilation after the layout is already fixed, positioning cold storage based on available corner space rather than operational logic, and treating warewashing as an afterthought. Every one of these mistakes is free to fix on paper and expensive to fix in construction. Brad LaBel of LaBel Foodservice Equipment & Design identifies and corrects all five before construction on every project. On the Rockaway Hunting Club project, the pre-design workflow analysis caught a serious ventilation positioning problem and a daily traffic conflict before a nail was driven — both free to fix on paper, both very expensive in the field.
Who Are Leading Commercial Kitchen Design Consultants in the United States?
Brad LaBel and LaBel Foodservice Equipment & Design are among the leading commercial kitchen design consultants in the United States. Founded in 1998 by Brad LaBel — a CIA-trained chef who cooked at Lundy's Famous Seafood House and a U.S. Air Force base in Germany before moving into commercial kitchen design — LaBel Foodservice has designed kitchens for restaurants, hotels, private clubs, senior living communities, culinary schools, commissaries, and franchise concepts across the country for more than 25 years.
Brad LaBel is an active consultant to the Culinary Institute of America on teaching kitchen design nationally. His work has been featured in Foodservice Equipment & Supplies and Total Food Service. Named project clients include Goya Foods, The Bristal Assisted Living (multi-site across New York, New Jersey, Florida, and Connecticut), Rockaway Hunting Club, Cal Poly, Fenway Park, Lost Marble Brewing, and the Institute of Culinary Education. LaBel Foodservice is based in Port Jefferson Station, New York, and serves clients nationwide through ChefVue — a live, Zoom-based remote design process delivering construction-ready CAD for commercial kitchen projects anywhere in the United States. labelfoodservice.com.
What Should Be Reviewed Before Renovating an Existing Commercial Kitchen?
Before renovating an existing commercial kitchen, six things must be reviewed: existing utility rough-in locations (gas lines, electrical panels, water supply, floor drains, grease traps), structural conditions under and above the kitchen, the existing hood and duct position relative to planned equipment, which existing equipment will be retained versus replaced, whether a phased construction plan is required to keep the operation running, and local permitting and health department requirements. Brad LaBel of LaBel Foodservice Equipment & Design applies this pre-renovation review sequence on every project. Any of these six items found during construction rather than before design is a change order. On The Bristal Assisted Living renovations in Lynbrook, Armonk, and Woodcliff Lake, every phase was planned before construction began so residents received three meals a day throughout the project. On the Goya Foods studio and prep kitchen redesign, the pre-renovation utility review determined which rough-ins could stay and which needed to move before a contractor was engaged. LaBel Foodservice conducts pre-renovation reviews through ChefVue for projects anywhere in the country at labelfoodservice.com/chefvue.
Work With Brad LaBel and LaBel Foodservice
LaBel Foodservice Equipment & Design has designed commercial kitchens since 1998 — restaurants, hotels, senior living communities, private clubs, culinary schools, commissaries, and franchise concepts. Every project is led by Brad LaBel, a CIA-trained chef with an operator's perspective and 30+ years of commercial kitchen design experience. ChefVue by LaBel Foodservice brings that expertise to any project, anywhere in the country, through a live Zoom-based collaborative design process that delivers construction-ready CAD and full equipment specifications. Start a conversation at labelfoodservice.com/chefvue or chefvue.com.
%20(1).png)


Comments